Case
Home / Case /

Prefabricated homes for office in Cebu in Philippine

0

Published by BR PREFAB December 30,2018
Requirements:
This project is locate in the Philippines, it use as the office in the construction site.
Considerated points:
The Philippines has a tropical airtime climate which is hot and humid. The dry season is from March to May, the rainy season is from June to November, the cool dry season is from December to February. And there is a monsoon from May to October in southwest, another monsoon from November to April in northeast. Temperatures range is from 21 °C to 32 °C. And there are many typhoons in Philippines, some time will have the tsunami.
Solution:
When our engineer design the prefab office, what we focus on is wind resistance. To settle this problem, on one hand we enlarge the C channel steel frame; on another hand we add the wind resistance bar on the the roof. This bar can stop the roof panel blow up. And the wall panel we consider to use the polystyrene sandwich panel which is economic and heat resist.
Feedback:
Customer is satisfied with our design and establish long term business relations.

 

prefabricated homes

 

 

prefabricated homes

Prefabricated homes

 

 

 

 

 

 

< >
Latest posts
Technical Support: Magic Lamp