Case
Home / Case /

Prefabricated steel warehouse in Ogun state Nigeria

0

Published by BR PREFAB April 14,2020

Brief introduction
Location: Ogun Nigeria
Time: 05 Dec 2016
Sqare: 5600 SQM
Foundation time:2 month
Installation time: 1 month
Instruction Engineer: 2
Local workers:   18 persons
Requirements
1,Span life: Up to 50 years.
2,Highly secure and reliable.
3,Low cost, easy and fast to build.
4,High strength, wide span and corrosion resistance.
Solution
1, After structural calculation, Choose HN350-175 as the main steel column and steel beam
2, Polystyrene (EPS)  sandwich panel as used for water proof and low cost
3, PVC sliding window which is heating insulation
4, 4000*5000 electric rolling door for truck enter in and out conveniently
5, Two layer Painting for steel parts after sandblasing, anti-corrosion very well.
6, Wall and roof purlin C shape galvanized steel are used for anti-corrosion.
7, Film packing for accessory and frame packing for main beam and column.
Feedback
BR PREFAB provide one stop service for steel structure warehouse including design, manufacture, shipping, installation, maintenance.Customer are satisfied with BR PREFAB excellent service.

 

 

Installation video

https://youtu.be/hfLoBHaWseQ

 

< >
Latest posts
Technical Support: Magic Lamp