Prefabricated steel structure for office building

0

Published by BR PREFAB April 22,2020

Project:office building
Location:Thailand
Size:5680 SQM
Completed time: 2015
Solution
BR PREFAB communicated with  owner about requirements for many times. In the consideration of architectural facade effect and project budget,  corrugated plate are choosed as the wall solution. and adjusted the window layout accordingly. which not only met the owner's requirements for the appearance, but also saved the cost.
BR PREFAB carry out accurate load capacity and wind capacity calculation,  portal rigid frame system are used. Steel deck and concrete as the secon floor ground. In terms of elevator selection, The elevator room and stair do not go out of the roof, , making the whole project more concise, exquisite and beautiful.
Feedback
The project was successfully completed in September 2015. During the half year construction period, all departments cooperated closely to complete the project with high quality as scheduled. Nothing makes us more proud than to be recognized by customers. BR PREFAB will continue to work hard to improve customer satisfaction and set up more excellent projects for the industry.

 

< >
Latest posts
Technical Support: Magic Lamp