Steel Framework camp with EPS sandwich panel project in Africa

0

Published by BR PREFAB December 13,2018

Project location: Ethiopia
Time: 26, July,2018
Quantity: 3500 SQM
Requirments:
The prefab hosue are used as construction site, need good design and quality. within the customer financail  budget.
Solution:
When our engineer design the prefab office, what we focus on is wind resistance. To settle this problem, on one hand we enlarge the C channel steel frame; on another hand we add the wind resistance bar onthe the roof. This bar can stop the roof panel blow up. And the wall panel we consider to use the polystyrene sandwich panel which is economic and heat resist.
Feedback:
Foshan Golden Belt and Road company did a good job and established the stratigical partner relations with the customer.

 

<