Light Steel Villa house

Light Steel Villa house

Prefabricated Concrete Villa With PVC Decoration Panel
m1.jpg
m2.jpg
m3.jpg

Prefabricated Concrete Villa With PVC Decoration Panel

Product Specification:
  • Price : 250-350
  • Min. Order : 1 set
  • Lead Time : 25 days
  • PaymentTerms : L/C, T/T
Inquiry Now
  1. Product Details

 Concrete Villa Specification

item specification mateiral
Steel Square tube Q235B
Panel 50mm,75mm,100mm Concrete panel
Door steel door steel door
Window 850*1990 aluminum
Floor 600*600 wooden ,ceramic

Features of concrete villa

1) Prefabricated concrete Villa is easier to build, lower cost, significantly time-saving and labor saving comparing to the traditional civil buildings.
2) Internal design can be customized as your own stylish apartment, with bedrooms, living room, kitchen and toilet inside.
3) External decoration sheet & internal wall paper applicable for better appearances inside & outside the house.
4) Ceramic tile, ceiling, sit down toilet, wash basin and shower are conventional arrangements.
5) Easy to build. The house is connected by bolt and screw. 6 labors one team, each day can install 100 square meter.

Light Steel Villa

 Drawings of villa house

 

Main steel frame production

 Concrete panel

Light Steel Villa

Light Steel Villa

FAQ 
Q1: Are your company a factory or trading company? Where is your factory?
A1: We are factory and located in Foshan. It takes half an hour from Guangzhou Baiyun International airport to our factory.
Q2: What is the advantage of your factory?
A2: We founded in 1995. We are the main drafter of China prefabricated house state stadard. We have 2 production base and covered more than 80 thousand square metres. Strong scal is beneficial us to reduce cost. High performance team could provide top production and service.
Q3: What kind of production do you have? If I have project, how to cooperate?
A3: Our productions have prefabricated house, container house, steel structure and light steel villa. Generally, we will understand the details of customer’s project, it include project ad dress,usage, drawing, climate, geological condition and so on. Then we will provide resonable solution to customer.
Q4: How long is your delivery time ?
A4: Within 25 workdays after confirming the drawings.
Q5: What is your quality control procedure?
A5: Our company have pass ISO9000,and all of production process is executing according to ISO9000 system file.
Q6: Could you supply the service of installation?
A6: Yes, we have 20 experienced supervisors who go to guide the installation at any time. Meanwhile, we have skilled installation team who could finishi some turn-key projects.
Q7: What is your opinion about the customer relationship ?
A7: We would like to establish long-term business relations with our every customer.with our strong team and production ability, We would like to support our customer according to our customers requirements.

Write us

Appreciate your interest in our products, Any of your inquiry will get our prompt reply.

Technical Support: Magic Lamp